Building details > 22 Applied Sciences

 

22 Applied Sciences

 

The Applied Sciences faculty is housed in four different locations. Preparations are currently underway for the renovation of the Applied Sciences building (22) and the construction of a new building for Biotechnology (12) and Chemistry (15) opposite the Nuclear Reactor at the Kluyverweg. The switch to low-temperature heating and high-temperature cooling systems is part of the  renovation-project. For the new building a system of cold and heat-storage will be installed. 

 

Buildings 5 (Biotechnology, Julianalaan 67), 12 and 15 (Chemistry, Julianalaan 136), 50 (Delft Reactor Institute (RID), Mekelweg 15) and 22 (Applied Sciences, Lorentzweg 1)


Gross floor area                      :  Together estimated as 113,800 m2

Number of people (approx.)     :  500

Time in use                            :  90 hrs/week

Heating                                   : B-5 own gas boilers; other buildings from the TU Delft heating network.

Cooling                                             : electric (air treatment system)

 

Energy Consumption Chart

At this moment, the actions for the new EEP 2017 – 2020 are being worked out.

For additional information, please contact FMVG Energy (Energie-FMVG@tudelft.nl)

Contact: Samiha Toussaint-Tahan S.J.Toussaint-Tahan@tudelft.nl